FuivJuix 4X1 Natural Black Lace Front Wigs Human Hair Natural Hairline 4X1 Hd Transparent Lace Closure Wig 16 Inch Brazilian Virgin Hair Water Wave Wig For Black Women 150% Density

Brand: FuivJuix Sold By: Everymarket
Out of Stock
Ships from United States Arrives in 10-17 business days
Item can be returned in its original condition for a full refund or replacement within 30 days of receipt.
Delivery:
20
February2026
-
03
March2026
FuivJuix 4X1 Natural Black Lace Front Wigs Human Hair Natural Hairline 4X1 Hd Transparent Lace Closure Wig 16 Inch Brazilian Virgin Hair Water Wave Wig For Black Women 150% Density

FuivJuix 4X1 Natural Black Lace Front Wigs Huma...

£87.08

Product Details
  • 4x4 Lace Closure Wig Material: 100% Brazilian Remy Human Hair,#1B Natural Black Color,No Shedding,No Tangle,Soft and Thick,Full,No Smell.
  • 4x4 Lace Closure Wigs Human Hair Construction: It Have Adjustable Straps And 4 Combs Around Your Ears For Different Sizes Of Head Circumference,Elastic Net Is More Breathable And Comfortable, Free Part Can Be Side Anyway, Cap Size Is 22.5 Inch For Medium Size.
  • Natural Black Lace Closure Wig Lace: 150% Density With Baby Hair, Pre Plucked ,Mediun Brown Color Lace Can be Bleach Match Your Complexion Color ,Swiss Lace Super Soft, Match Your Complexion Color.
  • 4x4 Human Hair Wigs Is Suitable For Various Occasions: Work, Travel, Party, Daily, Etc.Fashionable Shape Makes You Full Of Personal Charm.
  • Lace Closure Wigs Service: Same Day, Next Day And Second Day Delivery, Unconditional return and exchange,But please be careful not to damage the packaging.

  • Color: 4x1 #1B Water Wave Wig
  • Manufacturer: Xuchang Bifeng
  • Size: 16 Inch

FuivJuix Human Hair Wig~More Beautiful and Comfortable!

Wigs Specification:

1.Hair Material: Unprocessed Brazilian Deep Wave Human Hair Wig.

2.Wig Type: Lace Closure Water Wave Human Hair Wigs.

3.Lace Type: 4x1 Lace Closure, Medium Brown Color Swiss Lace.

4.Hair Cap: Elastic and Breathable Net, Medium Size(21.5-22.5 inch) with Adjustable Straps, 4 Combs.

5.Hair Density: 150% Density.

6.Hair Color: Natural Black Color Human Hair Wigs.

7.Hair Quality: Tangle-Free, Full and Thick, Soft Touch, Beautiful Appearance.

8.Occasion: Perfect for Daily use, Halloween, Concerts, Theme Parties, Weddings, Dating, And so on.

FAQ:

Q1:How to Measure the Length of Hair Correctly?

A1: It need you stretch the hair to be Straighten and then measure it.

Q2:How to Avoid Hair Tangling or Shedding?

A2:It is Not Easy to Get Tangled with Regular Care, Please Clean and Deep Conditioned the Wig Regularly. Detangle the Hair With wid tooth Comb.

Kind Reminder:

1. Wash And Deep Condition Hair Regularly. 2. Detangle Hair Gently With Wide Tooth Comb Or Hands. 3. Add Mild Shampoo To Cool Water And Wash Hair, And Don'T Rub Or Twist The Hair During Washing.

 

Shipping Summary

We currently ship exclusively to addresses within the United Kingdom.

Standard International Shipping from the United States to the United Kingdom is available at a flat rate of £9.99.


Shipping Time & Methods

Estimated Delivery Time: 10–17 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to UK):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–10 business days.

  • Domestic Delivery within the UK:
    Once the shipment arrives in the United Kingdom, it is handed over to Royal Mail for final delivery.
    UK domestic delivery typically takes an additional 3–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within the United Kingdom, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Refund & Return Policy

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.uk with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.uk with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.uk to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.uk with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service
22 Larch End, Uckfield, TN22 5GE


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.uk

 

  • 4x4 Lace Closure Wig Material: 100% Brazilian Remy Human Hair,#1B Natural Black Color,No Shedding,No Tangle,Soft and Thick,Full,No Smell.
  • 4x4 Lace Closure Wigs Human Hair Construction: It Have Adjustable Straps And 4 Combs Around Your Ears For Different Sizes Of Head Circumference,Elastic Net Is More Breathable And Comfortable, Free Part Can Be Side Anyway, Cap Size Is 22.5 Inch For Medium Size.
  • Natural Black Lace Closure Wig Lace: 150% Density With Baby Hair, Pre Plucked ,Mediun Brown Color Lace Can be Bleach Match Your Complexion Color ,Swiss Lace Super Soft, Match Your Complexion Color.
  • 4x4 Human Hair Wigs Is Suitable For Various Occasions: Work, Travel, Party, Daily, Etc.Fashionable Shape Makes You Full Of Personal Charm.
  • Lace Closure Wigs Service: Same Day, Next Day And Second Day Delivery, Unconditional return and exchange,But please be careful not to damage the packaging.

  • Color: 4x1 #1B Water Wave Wig
  • Manufacturer: Xuchang Bifeng
  • Size: 16 Inch

FuivJuix Human Hair Wig~More Beautiful and Comfortable!

Wigs Specification:

1.Hair Material: Unprocessed Brazilian Deep Wave Human Hair Wig.

2.Wig Type: Lace Closure Water Wave Human Hair Wigs.

3.Lace Type: 4x1 Lace Closure, Medium Brown Color Swiss Lace.

4.Hair Cap: Elastic and Breathable Net, Medium Size(21.5-22.5 inch) with Adjustable Straps, 4 Combs.

5.Hair Density: 150% Density.

6.Hair Color: Natural Black Color Human Hair Wigs.

7.Hair Quality: Tangle-Free, Full and Thick, Soft Touch, Beautiful Appearance.

8.Occasion: Perfect for Daily use, Halloween, Concerts, Theme Parties, Weddings, Dating, And so on.

FAQ:

Q1:How to Measure the Length of Hair Correctly?

A1: It need you stretch the hair to be Straighten and then measure it.

Q2:How to Avoid Hair Tangling or Shedding?

A2:It is Not Easy to Get Tangled with Regular Care, Please Clean and Deep Conditioned the Wig Regularly. Detangle the Hair With wid tooth Comb.

Kind Reminder:

1. Wash And Deep Condition Hair Regularly. 2. Detangle Hair Gently With Wide Tooth Comb Or Hands. 3. Add Mild Shampoo To Cool Water And Wash Hair, And Don'T Rub Or Twist The Hair During Washing.

 

Shipping Summary

We currently ship exclusively to addresses within the United Kingdom.

Standard International Shipping from the United States to the United Kingdom is available at a flat rate of £9.99.


Shipping Time & Methods

Estimated Delivery Time: 10–17 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to UK):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–10 business days.

  • Domestic Delivery within the UK:
    Once the shipment arrives in the United Kingdom, it is handed over to Royal Mail for final delivery.
    UK domestic delivery typically takes an additional 3–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within the United Kingdom, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Refund & Return Policy

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.uk with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.uk with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.uk to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.uk with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service
22 Larch End, Uckfield, TN22 5GE


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.uk

 

Oops!

Sorry, it looks like some products are not available in selected quantity.

OK